Lower Weyand Lateral Replacement Project
Solano Irrigation District, California
Coastland | DCCM prepared construction documents for 8,100 feet of 18-inch to 48-inch diameter DR 17 HDPE pipe, directional drilling of 18-inch diameter DR 17 HDPE pipe and connections to existing pump stations. The design included determining alternative alignments, preparation of right-of-way acquisition documents, completion of encroachment permits (including traffic control plans), topographic survey, drafting construction standards and details for new materials and construction methods, drafting plans and specifications, construction cost estimates, and project schedules for these projects.